Automotive Aftermarket Efficiency

Improved facility throughput, flow, and labor efficiency

Situation:
A leading automotive aftermarket manufacturer was facing large impending order volumes and turned to Kormac for help in improving throughput, quality, and facility flow.

Actions:

  • Developed future vision for one-piece flow through
    the entire operation
  • Improved shop flow using only existing equipment
    (no CapEx required) and minimal disruptions
  • Addressed the labor-intensive areas of the
    facility that were bottlenecks to efficient flow
  • Developed standard work, labor crewing, and innovative approaches to improve output

Results: Improved flow and reduced labor content by 32% per unit. Increased throughput by >50% (from <30 units per day to 45+ units). Improved Right First Time quality through reduced handling and damage of units during the manufacturing process.

Kormac Results: Reduced labor content by 32% per unit. Increased unit throughput by more than 50%. "The Kormac Group found innovative and cost-effective solutions that improved Right First Time quality, throughput, and employee morale." - CEO, automotive aftermarket manufacturer.